Share Video Categories Channel

Tunnel Construction Machinery Intelligent Arch Frame Trolley with Integrated Technology

2025-04-13 introduction 4320
LG312M
28t
138.5kw
87.5kw
Electric Construction + Diesel-Powered Emergency
Wireless Remote Control + Manual Control
38V
18*12.5m
Operating Chassis
Bidirectional Driving (Dual Cabs)
Four-Wheel Drive, Four-Wheel Steering
400mm
32%
15m (Two Wheels) 8m (Four Wheels)
25km/H
17°/15°
LANHI
Nothing
11800× 3200× 3200mm
China
Oppose 0
Awards 0
Comment 0