Share Video Categories Channel

Prefabricated Steel Structure Frame Factory Warehouse Steel Workshop Construction Building

2025-04-13 introduction 3500
STL-Steel Structure
Installation Guide,2D & 3D Drawing, Video,
Bolt Connection
Steel H Column,H Beam,Purlin,Tie Beam,Coverage Et
Quality Carbon Structural Steel And Alloy Structural Steel
Weld, Hot-Rolled Steel, Cold Drawn Steel, Forging
Wall Support
Steel H Column,H Beam,Purlin,Tie Beam,Coverage Et
High-Strength Steel
Frame Structure
Free Design Drawing, 2D& 3D Version
80~280km/H, 30~200kg/M2, Grade 9
Steel Portal Frame Building
4~6 Weeks
ISO, CE, Third Party Inspect
10%, 12%, 16%, 25%, 30%etc
5m, 6m, 7, 9m etc
Hot Rolled H Beam or I Beam
Round Pipe or Square Tube
C Purlin, Z Purlin, Hot Rolled H Beam Purlin
Single Corrugated Sheet or Sandwich Panel
Single Corrugated Sheet or Sandwich Panel
PVC or Aluminum Alloy Frame Window
Sliding Industrial Door or Roller Shutter Door
Skylight Belt, Ventilation Fitting, Gutter, Crane
STL
Main Structure Loading in 40FT Ot, Others Loading
Customized
China
7308900000
Oppose 0
Awards 0
Comment 0