Share Video Categories Channel

Prefabricated Steel Structure Building, Steel Industrial Construction Modular Warehouse Workshop Building Prefabricated Steel Structure Building

2025-04-13 introduction 2740
STL-steel structure building
Installation Drawing, Installation Video
Design Plan Drawing, Install Shop Drawing
80~280km Per Hour
30~200kg Per Sqm
7~9 Grade
ISO, CE, Third Party Inspect
10%, 12%, 16%, 25%, 30%etc
5m, 6m, 7, 9m etc
H Section Steel
Round Pipe or Square Tube
C Purlin, Z Purlin, Hot Rolled H Beam Purlin
Single Corrugated Sheet or Sandwich Panel
Single Corrugated Sheet or Sandwich Panel
PVC or Aluminum Alloy Frame Window
Sliding Industrial Door or Roller Shutter Door
Skylight Belt, Ventilation Fitting, Gutter, Crane
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing
GB, ASTM, DIN, BS, En1090
Quality Carbon Structural Steel and Alloy Structural Steel
Bolt Connection
High-Strength Steel
Wall Support
30 Years
Steel Structure
Weld, Hot-Rolled Steel, Cold Drawn Steel, Forging
Steel H Column, H Beam, Purlin, Tie Beam, Coverage Et
Q355b, Q235B, A36 etc
STL
Main Structure Loading in 40FT Ot, Others Loading
Customized
China
7308900000
Oppose 0
Awards 0
Comment 0