Share Video Categories Channel

Portal Frame Steel Structure Construction Building for Prefabricated Commercial Warehouse /Industrial Fabricated Workshop /Prefab Office

2025-04-13 introduction 2010
STL-steel structure
Installation Drawing, Installation Video
Bolt Connection
Free Design Drawing, 2D& 3D Version
80~280km/H, 30~200kg/M2, Grade 9
Steel Portal Frame Building
4~6 Weeks
ISO, CE, Third Party Inspect
10%, 12%, 16%, 25%, 30%etc
5m, 6m, 7, 9m etc
Hot Rolled H Beam or I Beam
Round Pipe or Square Tube
C Purlin, Z Purlin, Hot Rolled H Beam Purlin
Single Corrugated Sheet or Sandwich Panel
Single Corrugated Sheet or Sandwich Panel
PVC or Aluminum Alloy Frame Window
Sliding Industrial Door or Roller Shutter Door
Skylight Belt, Ventilation Fitting, Gutter, Crane
GB, ASTM, DIN, BS, En1090
Quality Carbon Structural Steel and Alloy Structural Steel
High-Strength Steel
Wall Support
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Steel Warehouse, Steel Building, Steel Shed
30 Years
Steel Structure Building
Weld, Hot-Rolled Steel, Cold Drawn Steel, Forging
Steel H Column, H Beam, Purlin, Tie Beam, Coverage Et
Q355b, Q235B, A36 etc
STL
Main Structure Loading in 40FT Ot, Others Loading
Customized
China
7308900000
Oppose 0
Awards 0
Comment 0