Share Video Categories Channel

Lgm312n Prefabricated Arch Frame Installation Trolley for Highways and Railways Advanced Arch Anchor System with Intelligent Features

2025-04-13 introduction 2600
LGM312N
1 Year
CE, RoHS, ISO 9001:2000, ISO 9001:2008
38t
138.5kw (National IV)
159kw
Electric Construction + Diesel-Powered Walking an
Wireless Remote Control + Manual Control
380V
17×12m
Operating Chassis
Bidirectional Driving (Front and Rear Dual Cabs)
Four-Wheel Drive, Four-Wheel Steering
380mm
36%
15m (Two Wheels)/ 8m (Four Wheels)
15km/H
LANHI
Nothing
11360× 3665× 3355mm
China
Oppose 0
Awards 0
Comment 0