Share Video Categories Channel

China Factory Prefabricated Steel Structure Framed Warehouse Workshop Office Building Steel Structure

2025-04-13 introduction 3630
STL-steel Structure
Installation Drawing, Installation Video
Online Guidance
Fixed
Building Platforms, Industrial Platform, Transportation Platform, Steel Structure Building
Free Design Drawing, 2D& 3D Version
80~280km/H, 30~200kg/M2, Grade 9
Steel Portal Frame Building
4~6 Weeks
ISO, CE, Third Party Inspect
10%, 12%, 16%, 25%, 30%etc
5m, 6m, 7, 9m etc
Hot Rolled H Beam or I Beam
Round Pipe or Square Tube
C Purlin, Z Purlin, Hot Rolled H Beam Purlin
Single Corrugated Sheet or Sandwich Panel
PVC or Aluminum Alloy Frame Window
Sliding Industrial Door or Roller Shutter Door
Skylight Belt, Ventilation Fitting, Gutter, Crane
GB, ASTM, DIN, BS, En1090
STL
Main Structure Loading in 40FT Ot, Others Loading
Customized
China
7308900000
Oppose 0
Awards 0
Comment 0