
Xingtai Sanshan Cable Co., Ltd. was established in 2007
We specialise in wire and cable manufacturing and sales
With very good quality, reasonable price, and perfect after-sales guarantee
We can provide more services
1.A-Z complete service
2.Delivery on time with guaranteed quality
3.Returnable and refundable if you are not satisfied when you receive the goods
4. Secure payment terms
We are looking forward to establishing a long-term partnership with you and hope that our products can meet your needs. If you have any questions or need further assistance, please feel free to contact us. Thanks!
wholesale PVC protective cover electrical power cable for Architectural field with corrosion resistance (IEC)
YJV cable is a type of power cable widely used for power transmission with good insulation and conductivity. It is reliable and durable.
The YJV22 cable typically has a copper conductor. The insulation is made of cross-linked polyethylene. It has a rated voltage of 0.6/1kV or higher. The available core numbers range from single-core to multi-core. The outer sheath is made of PVC, offering good protection. The cable's diameter and weight vary depending on the size and specifications.
Model/Standard | CU/XLPE/LSOH, IEC 60331, IEC 60502, IEC 60227, IEC 60331, IEC 601034, IEC 60754, GB/T 12706-91, GB306.1-2001, GB/T18380.3-2001, CE, CCC, KEMA |
Conductor Material | Circular stranded copper conductor, conforms to IEC 60228 class 2 |
Insulation Material | XLPE/A |
Inner Covering | LSOH |
Sheath Material | LSOH, black |
Insulation Color | As per standards or customer requirement |
Rated Voltage | 0.6/1kV |
Max. Conductor Temperature | Normal: 90°C; Short circuit (5 seconds): Maximum conductor temperature not exceeding 250°C |
Min. Ambient Temperature | Cable should be preheated if ambient temperature is below 0°C |
Min. Bending Radius | Single-core cable: 20(d+D)±5%; Multi-core cable: 15(d+D)±5% |




















1.Delivery: | On-time delivery is guaranteed within7-15 business days of receipt of deposit We are willing to acceptresponsibility for any delays. |
2. Payment: | 30% prepayment, 70% before shipment after production |
3.Package: | Plastic wrap or carton packing |
4:Others: | to ensure that the shipment is consistent with the des cription, if there is a quality problem, we are responsiblefor related matters |