WHJ2-120*3500
Most Issues Are Resolved Within 24 Hours
1 Year Warranty Since Delivery
New
Semi-Automatic
not CNC
220V
2.5kw
450-3500mm
20-120mm
120mm
110mm
0~399 Degree
1000kg
Hisena Machinery
Plywood Package or Container
4300*1100*1700mm
China
Product Description
Product Description
WHJ2-120*3500 is a double head seamless welding machine for making pvc windows and doors.
Details Images




Hisena CNC,since 2008

Our Team

Our Customers
WHJ2-120*3500 is a double head seamless welding machine for making pvc windows and doors.
- Applicable material:white and colored pvc profile
- Double heads for welding two corners at a time.
- Welding for both 90 degree and V-shaped corners.
- Automated welding process.
- Seamless welding type,no slag left on the upper and lower corners when welding is done.
- Movable right head can be locked by manual or pneumatic braking.
- Equipped with touch screen for easy adjustment of melting time and welding time.
- Several backing plates are included for different types of profiles.
Model | WHJ2-120*3500 |
Power supply | AC 220V/50Hz |
Total Power | 2.5kw |
Air pressure | 0.5-0.8Mpa |
Air consumption | 200L /min |
Welding length | 450-3500mm |
Welding height | 20-120mm |
Welding width | ≤120mm |
Welding mullion width | ≤110mm |
Melting Temperature | 0~399ºC |
Overall dimension | 4300*1100*1700mm |
Details Images





Hisena CNC,since 2008



Our Customers

FAQ
• Are you factory or trading company?
We are a factory with more than 10 years experience in manufacturing door and window equipmen
• What kind of payment methods do you have?
We support T/T and L/C payment.
• Do you have customized service?
Yes, we can do customized order.
• How about shipping time and method?
The delivery time of our regular stock machines is 10-15 days, and the shipping method is mainly by sea. Small machines, tools and accessories can be shipped by air.
• How long is the service life and warranty?
The designed service life of our machines can be more than ten years, and all machines have one year warranty except consumables.
• How to install and use the machine after arrival?
Our equipment has been debugged before leaving factory to meet production standard requirements.
We can provide engineers on-site installation training, remote videophone installation guidance, installationand commissioning videos, user manuals and variety methods.
• How to do the maintenance for machine?
Please carry out daily maintenance, monthly and annual maintenance and inspection for the machine according to the requirements in product instruction manual.