• Overview
  • Details
  • More
Share Products Categories Channel Cart

1/6
Steel Formwork System for Viaduct Construction图1Steel Formwork System for Viaduct Construction图2Steel Formwork System for Viaduct Construction图3Steel Formwork System for Viaduct Construction图4Steel Formwork System for Viaduct Construction图5Steel Formwork System for Viaduct Construction图6

Steel Formwork System for Viaduct Construction

Price $1050.00
Min Order 1 Ton  
Shipping from Beijing, China
Quantity
-+
Product details
Column template
Yes
One Year
ISO
Steel
Column Formwork
Yes
Customized
Customized
Container
Aoyu
7308900000
Product Description
Basic Info.
Model NO.AY86,AY106,AY126,MaterialSteel Wood
TypePier pillar formworkSpecificationQ235B
Panel thickness6mmWidth500-6000mm
Maxmum lateral pressure80 kn/square meterHeight2000mm
Guardrail height1200mmAppliation scopeRoads,Railways,Water conservancy
Number of Platform2m/layerWidth of Operating Platform900mm
Transport PackagePackage Box, Steel Pallet, Steel Frame, ContainerBrandAoyu
OriginChinaProduction Capacity14000square meter/Month
 

Product Description

Steel Formwork System

Our Steel Formwork System stands as a testament to strength and durability, ideal for repeated use across various construction projects. Effortless in assembly and erection, this system is tailored to meet the demands of high-volume, same-structure applications such as high-rise buildings, roads, and bridges. It offers a fixed shape and structure, ensuring consistency and reliability on every project.
 

Packaging:

1. Generally, the total net weight of a loaded container ranges from 22 to 25 tons, which must be confirmed prior to loading.
2. Different packages are tailored for different products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are secured in bags and placed on pallets.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, production typically requires 20-30 days following receipt of the customer's down payment.
2. Transportation: Lead times vary depending on the destination port's charges.
3. Special requirements necessitate further negotiation.

FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two dedicated factories.

Q2: What do you do?
A: We specialize in designing and manufacturing formwork products primarily used forbridge and tunnel construction.

Q3: What can you do for us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, or contractors.
B: We supply our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: Our outstanding formwork products are also available to support our peers worldwide.

Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after contract signing?
A: Typically, it takes 30~60 days, contingent upon the type and quantity of products ordered.

Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.
Buyer review
Loading review details...
Contact

Beijing Aoyu template Co., Ltd.

Audited Supplier1 Year
ProfileCertified by SGS/BV

Message Type

* Content

* Name

* Phone

* Email

* Captcha

captcha

Recommended for you