SSAW Welded Steel Pipe
                        Welded
                        SAW
                        Carbon Steel
                        Black
                        Pipeline Transport, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose, Piling Pipe
                        Round
                        Gr.B-X80
                        Less Than 15/20/25/30/40/50/60 Days
                        Plain or Beveled
                        219-3220mm
                        Chief Steel
                        by Bulk/ Container
                        CE, API, AS, JIS, EN
                        China
                        73051900
                        
                        Product Description
                    
                                
                        Production description 
Product application 

spiral steel pipe can used for low-fluid transportation, oil and gas transportation, as well as used for steel pilings.
production process

Packing
Packing:
1.In bundle, black, caps, beveled ends or plain ends
2.OEM/ customer's REQUEST
3.Marks: Standard * Material*OD*WT*L *Lott No./required
Shipping:
a. Length: ≤5.85m, loaded in 20FT Container, Max 22tons
b. Length: ≤11.85m, loaded in 40 FT Container, Max 27tons
c. Length: ≥12m, shipped by bulk vessel. FILO terms
d. Delivery time :about 20-30 days after received deposit

Quality testing

FAQ
Q1:How about thequality?
A:Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q2: How long is the delivery time?
A: Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And alsoaccording to the quantity.
Q3:Do you provide samples? Free or not?
A: Yes, we could offer the sample for free but do not pay the cost of freight.
Q4:May I customize the steel pipe?
A:Sure you can, we can produce according to your requirement, you can send the CAD ordesign drawing.
Q5:Any value-added Services?
A:Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessitiesto perform in-house painting,coating,pipe cutting, jointed welding, and make machanical fabricate per to request.
Q6: How about the trade terms?
A: EXW, FOB, CFR, CIF, LC will be accepted.
                    
                | Product Name | API series ssaw steel pipe | |
| Size | OD: | 219-3220mm | 
| Thickness: | 4-25.4mm | |
| Length: | fixed lentgh, as 12m - 80m per to requset | |
| Steel Material | GR.B-X80, S275JR/J0/K2H, S355J0H, S355J2H St52-0 etc. | |
| Standard | EN10219 / ASTM A 252 /ASTM A53 / API5L | |
| Usage | Used For Gas, Petroleum, Water ,Oil, Structure, Sewage and Piling pipe | |
| Ends | Plain or Beveled (Can be Protected By Plastic Pipe Cap) | |
| Surface | Bared Or Paint With Oil, Bitumen,1-3 layer PE, Juton coating, (Outside Or Inside Anti-Corrosion Treatment Can Supply) | |
| Inspection | With Hydraulic Testing, Eddy Current , Infrared or X-Ray Test Also With Chemical And Physical Property Inspect | |
| Technique | Submerged Arc welding, with cold formed | |
| Type | Welded | |
| Welded Line Type | Spiral | |
| Section Shape | Round | |
| Package | In Bulk, Or Other Method According To The Contract | |
| Date of Delivery | Less Than 15/20/25/30/40/50/60 Days According To The Quantity | |
| Port of Shipment | Main Port,China | |
| Others: | We also supply pipe fittings for example screws and flange Our products are high quality but low price. Wish you contact us. | |

spiral steel pipe can used for low-fluid transportation, oil and gas transportation, as well as used for steel pilings.
production process

Packing
Packing:
1.In bundle, black, caps, beveled ends or plain ends
2.OEM/ customer's REQUEST
3.Marks: Standard * Material*OD*WT*L *Lott No./required
Shipping:
a. Length: ≤5.85m, loaded in 20FT Container, Max 22tons
b. Length: ≤11.85m, loaded in 40 FT Container, Max 27tons
c. Length: ≥12m, shipped by bulk vessel. FILO terms
d. Delivery time :about 20-30 days after received deposit

Quality testing

FAQ
Q1:How about thequality?
A:Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q2: How long is the delivery time?
A: Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And alsoaccording to the quantity.
Q3:Do you provide samples? Free or not?
A: Yes, we could offer the sample for free but do not pay the cost of freight.
Q4:May I customize the steel pipe?
A:Sure you can, we can produce according to your requirement, you can send the CAD ordesign drawing.
Q5:Any value-added Services?
A:Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessitiesto perform in-house painting,coating,pipe cutting, jointed welding, and make machanical fabricate per to request.
Q6: How about the trade terms?
A: EXW, FOB, CFR, CIF, LC will be accepted.






















