
Product Advantages
Specification | 6058*2438*2896mm |
Roof Type | Flat Roof |
Wall Cladding | EPS or Glass Wool Sandwich Panel |
Frame | Galvanzied thickness 3mm or 4mm |
Door | Steel Door |
Window | PVC Window |
Project Overviews




Payment and Delivery Terms
Payment Terms:T/T 30% as deposit, and the 70% balance before shipment
Packaging & Delivery: Seaworthy export standard, 20' GP, 40' GP, 40' HQ, 40' OT.
Delivery Detail: 20-45 days

Our Service
1)Rich experience and professional team
With more than 10 years' experience, our employees have been professionally trained and evaluated , we can manufacture strictly according to your drawings and request or design by ourselves to provide you a most satisfactory solution to you.
2)Advanced equipment
We also have possessed more than 80 sets of large precise and domestically advanced processing equipment, including large gantry
planning machines, automatic submerged arc welding machines, assembling machines, slitters, shot blasting machines and so on.
3)Strictly quality control, Inspection every production link
There are 2-3 quality inspection personnel in each of our workshop to carry out the product inspection and reinspection
4)Preinstall before delivery
We test assembling after assembling the first batch products, and then batch assembly if they're qualified
5)Prompt Delivery.
Within 25-60 days after the order confirmed, also depends on the fabrication quantity.
We offer One stop service from design, manufacture, deliver to installation and after-service.

About Us
Established in 2011,Qingdao Taiwei Steel Structure Co., Ltd is a large-scale professional manufacturer specializing in designing, modeling, manufacturing and installing Steel Structure Projects.
Advanced equipment, great production capacity and prompt delivery that make us establish good relationship with more than 90 countries and regions:Canada,The United States,UAE,South Africa,Germany,France,Japan,Argentina,Venezuela and many other countries and regions. And we have participated in many significant construction projects, such as Argentine Workshop, Australian Aircraft Hanger, Mauritius Government Projects and so on.

1.Are you a factory or trading company?
We're factory with competitive price.
2.How long does it take to build a container house?
It depends on the size of the house and the complexity of the house.Usaually a 50-square meter house will takes 5 workers to finish in 1-3 days
3.Is the steel frame safe and stable?
Yes, here is the statistics: Earthquake resistance: Grade 8 or more, Wind resistance: Grade 10
4.How can I assemble the container house?
We will send you a video to help you about this