• Overview
  • Details
  • More
Share Products Categories Channel Cart

1/6
Plastic Product for Haier Washer图1Plastic Product for Haier Washer图2Plastic Product for Haier Washer图3Plastic Product for Haier Washer图4Plastic Product for Haier Washer图5Plastic Product for Haier Washer图6

Plastic Product for Haier Washer

Price $0.60
Min Order 1 Piece  
Shipping from Shandong, China
Quantity
-+
Product details
RTE-08010123
Injection Mould
Polishing
Single Cavity
PA6+15gf
Single-Process Mode
Household Appliances
Cold Runner
UG
Fixed
ISO
DME
Customized
PA6+15gf
1X1
20-30 Days
780 Tons
Root
Wooden Box
CE/SGS/RoSH
Qingdao Shandong
8480710090
Product Description
Specialize in plastic Injection Mold/Hot Runner Mold/Gas Assistant Mold/High Glossy Mold/2K Injection Mold/Over Mold/IML/Stack Mold.
Professional Auto Engine Part Mould Manufacturer over 17 years, certificated by ISO 9001: 2008.


Advantage:
High quality & competitive price & professional skills.
In house strict quality control.
On time delivery.
All mold could be produced automatically

Item: Plastic Injection Mold
Part Material: PC/PP/PBT/ABS/PMMA/PU/PE/PVC
Core &Cavity Steel: P20/H13//GS2344/NAK80/ASSAB718HASSAB8407
Mold Base Steel: P20/1050/S50C/
Runner: Hot or Cold
Gate Type: Sprue Gate/Pin Point Gate/Edge Gate/Submarine Gate/Fan Gate/Ring Gate
Cavity No: Single or Multiple.
Mold Base Standard: DME/LKM/HASCO/Etc.
Spare Parts Standard: DME/HASCO/DAIDO/MISUMI/Customized is acceptable.
Mold Life: 30k-1, 000 k
Cycle Time: 10-120 s
Lead Time: 30-45 days
Injection Machine: 50-1200 Ton




Offered Service:
Mold progress report and tooling schedule will be provided weekly.
The first testing sample for buyer's inspection and work out improvement requirements will be provided.
Mold testing video, 2D part drawing and 3D mold design before shipment will be provided.

Payment and Delivery
Payment: TT 50% in advance, Balance before shipment
Delivery Time: 30-45 days
Specification
Injection Machine Size:50-1600 tons
Resin:ABS, PP, PE, Pet, EVA, PMMA, PC, PU, PA etc
Preferred Formats:STP/IGES/UG
Lead Time:7-15 days
Buyer review
Loading review details...
Contact

Qingdao Root Industrial and Trading Co., Ltd.

Audited Supplier11 Years
ProfileCertified by SGS/BV

Message Type

* Content

* Name

* Phone

* Email

* Captcha

captcha

Recommended for you