• Overview
  • Details
  • More
Share Products Categories Channel Cart

1/6
Industrial Construction Projects 3mm 4mm Thickness for Roofing Protection Sbs Bitumen Waterproof Membrane图1Industrial Construction Projects 3mm 4mm Thickness for Roofing Protection Sbs Bitumen Waterproof Membrane图2Industrial Construction Projects 3mm 4mm Thickness for Roofing Protection Sbs Bitumen Waterproof Membrane图3Industrial Construction Projects 3mm 4mm Thickness for Roofing Protection Sbs Bitumen Waterproof Membrane图4Industrial Construction Projects 3mm 4mm Thickness for Roofing Protection Sbs Bitumen Waterproof Membrane图5Industrial Construction Projects 3mm 4mm Thickness for Roofing Protection Sbs Bitumen Waterproof Membrane图6

Industrial Construction Projects 3mm 4mm Thickness for Roofing Protection Sbs Bitumen Waterproof Membrane

Price $4.00
Min Order 2000 Square Meters  
Shipping from Hubei, China
Quantity
-+
Product details
SBS-EL
1m
10m
Waterproof Roll Material
Waterproof
Modified Bitumen
PE Film,Mineral Particles(Sanded Type)
Py Polyester Tire
90ºC-105ºC
-25ºC--20ºC
0.3MPa
ISO9000/ISO4000/ISO45001
Maximum/(N/50mm)≥≥500n/50mm
≥30%
JUYONS
Pallet Transport
3mm, 4mm
Hubei Province, China
Product Description
Industrial Construction Projects 3mm 4mm Thickness for Roofing protection SBS Bitumen Waterproof Membrane






PRODUCT FEATURES:
1.With strongimpermeability.
2. High tensile strength, large elongation, good dimensional stability, and strong adaptability to shrinkage,deformation and crackingof the base layer.
3. Good resistance to high and low temperatures, suitable for building waterproofing in lower
temperatureenvironments.
4. Good puncture resistance, tear resistance, corrosion resistance, mildew resistance, andweatherresistance.
5. Hot melt construction method is easy operation, can provide reliable and durable hot joints.


APPLICATIONINSTRUCTIONS:
1. Surface Preparation: Check the flatness of the base layer and clean it well to ensure that the base layer is dry, solid,smooth and clean.
2. Priming: Apply asphalt base treatment agent by roller or brush, at a dosage of0.3KG per square meter.
3. Membranes Paving: use hot melt torch to heat the lower surface ofthe membranes until it is molten, and at the sametime roll the upper surface with a roller to paste the membranes on the base layer.
4. Membranes Overlap: The membranes should be smooth and straight paving, and accurately position succeedingsheets to overlapthe previoussheet100mm.
5. inspection: After the construction of the waterproof layer is completed, wait for 24 hours to do the water storageexperiment. The next process can be carried out after checking that there is no water leakage.

APPLICATION:
It is most suitable for roofing work,and can also be used for structural waterproofing of underground works, as well aswaterproofing ofthe ground, moisture-proof works, and outside waterproofing of pools and swimming pools.



Buyer review
Loading review details...
Contact

Hubei Juyons Waterproof Materials Technology Co., Ltd.

Audited Supplier1 Year
ProfileCertified by SGS/BV

Message Type

* Content

* Name

* Phone

* Email

* Captcha

captcha

Recommended for you