High temperature Round PPS Filter Sleeve with SS Snapband for Power Plant:
Description:

Needle punched Polyester,Arcylic,Aramid,PPS,P84,PTFE,Fibreglass felts for filtration are exhibiting excellent performance under wet,acid,alkali and normal-temperature and high temperature environments.
The melting temperature of all material is as high as 90oc to 300oc.
Filter Bag Top:
Carbonsteel snapband&SS snapband.
Bottom:Reforcement 100mm or Disc.
Size:Customized.

PPS filter bags are used for higher temperature applications with a maximum continuous operating temperature of 160ºC.
PPS filter bags raw material is made of Japan Toray PPS high quality fiber and produced by Germany equipment to loosening, needle punching.
Technical Specification:
Fibre | PPS |
Scrim | PPS |
Weight(G/M2) | 450~550 |
Thickness (mm) | 2.2 |
Width (mm) | ≤ 2.2 |
Length | 50m/roll |
Finish treatment | Singeing,Calendering,PPS dipping treatment,with PTFE membrane or oil&water repellent treatment.. |
Air permeability (m3/m2/min): | 6~10 |
Tensile strength (N/5× 20cm) | Warp:>900 Weft:>1200 |
Tensile elongation (%): | Warp:<35 Weft:<50 |
Temperature (ºC): | Continue: 170 Instant: 210 |
Anti-acid | Excellent |
Anti-alkali | Excellent |
Anti-abrasion | Excellent |
Hydrolytic stability | Excellent |
Producing Process:
Install Diagram:
Applications:
More Production:
Packaging & Delivery:
Foreign Trade Team:



Exhibization:
Certificate:
Competitive Advantages:
1. 100% custom pass guaranteed.
2. Our products have been exported to Germany, Norway, Poland, Finland, Spain, UK, France, Russia, USA, Brazil, Mexico, Australia, Japan, Korea, Thailand, Indonesia, Uruguay and many other countries.
3. Flexible and Untraceable payment terms.
4. Good after-sale service.
5. We offer high quality products at competitive price in quick delivery
Shipping Details:
SHIPPING (Normally arrive port time in working days) | ||||
Destination | Express/Courier | SHIP BY SEA | SHIP BY AIR | SHIP BY EMS |
DHL/FEDEX/UPS/TNT | ||||
North America | 3~7 days | 15~24 days | 5~7 days | 10~12 days |
South America | 3~7 days | 15~25 days | 5~7 days | 10~12 days |
European Countries | 3~7 days | 20~30 days | 5~7 days | 10~12 days |
Africa Countries | 3~7 days | 40~50 days | 5~7 days | 10~12 days |
The Middle East | 3~7 days | 15~25 days | 5~7 days | 10~12 days |
Australia | 3~7 days | 10~15 days | 5~7 days | 10~12 days |