• Overview
  • Details
  • More
Share Products Categories Channel Cart

1/6
High Loading Strength Voided Slab Disposable Plastic Crawl Space Formwork for Building Foundation Construction图1High Loading Strength Voided Slab Disposable Plastic Crawl Space Formwork for Building Foundation Construction图2High Loading Strength Voided Slab Disposable Plastic Crawl Space Formwork for Building Foundation Construction图3High Loading Strength Voided Slab Disposable Plastic Crawl Space Formwork for Building Foundation Construction图4High Loading Strength Voided Slab Disposable Plastic Crawl Space Formwork for Building Foundation Construction图5High Loading Strength Voided Slab Disposable Plastic Crawl Space Formwork for Building Foundation Construction图6

High Loading Strength Voided Slab Disposable Plastic Crawl Space Formwork for Building Foundation Construction

Price $10.00
Min Order 800 Pieces  
Shipping from Jiangsu, China
Quantity
-+
Product details
Crawl Space Formwork
Online
1 Year
ISO, CE, Patent Certificate;SGS
PP/Polypropylene
Wall Formwork
58*58*15cm
1.78kg
Customized
Tpcsdf
Hotel, Public Structures (Schools, Hospitals, etc)
TOPO NEW
225PCS/Pallet
58*58*15cm
China
3926100000
Product Description
Plastic PP Crawl formwork for concrete

Product Description                                                                                                                     
Product namePP Disposable Formwork for Building Construction
ColorCustomized Color
Product advantages
  1. STACKABLE: Unmatched logistical advantages when transporting and storing. At a height of 50 cm, conventional filling requires 50 trucks of filling in comparison to only 1 truck of NEW ELEVATOR.
  2. LIGHTNESS: By far it is the lightest filling solution; the total weight of the cross-section is approximately equal to the thickness of the upper slab.
  3. HIGH LOAD BEARING: Countless pillars, arches, and domes create the highest load-bearing structure.
  4. VOID n SPACE: The void space created under NEW ELEVATOR allows an easy installation of electrical as well as mechanical systems. The void space is also perfect to ventilate damp and RADON GAS away from the building.
  5. FAST: When compared to traditional systems, it guarantees faster installation times up to 80% (in respect to the use of the traditional inert materials).
  6. SAVINGS: NEW ELEVATOR system allows savings compared to the use of traditional inert materials, especially in terms of transport and installation.   
ApplicationsBuilding Construction
Product MaterialPP/polypropylene

Concrete Typical Technical Data of TPDVF System                                                                 










Packing and Delivery                                                                                   

Buyer review
Loading review details...
Contact

Suzhou Topo New Material Co., Ltd.

Audited Supplier5 Years
ProfileCertified by SGS/BV

Message Type

* Content

* Name

* Phone

* Email

* Captcha

captcha

Recommended for you