• Overview
  • Details
  • More
Share Products Categories Channel Cart

1/6
Hammer Hydraulic Injection Pile Driver /Bore Pile Machine Malaysia图1Hammer Hydraulic Injection Pile Driver /Bore Pile Machine Malaysia图2Hammer Hydraulic Injection Pile Driver /Bore Pile Machine Malaysia图3Hammer Hydraulic Injection Pile Driver /Bore Pile Machine Malaysia图4Hammer Hydraulic Injection Pile Driver /Bore Pile Machine Malaysia图5Hammer Hydraulic Injection Pile Driver /Bore Pile Machine Malaysia图6

Hammer Hydraulic Injection Pile Driver /Bore Pile Machine Malaysia

Price $28800.00
Min Order 1 Set  
Shipping from Shandong, China
Quantity
-+
Product details
HWL390H
Support
Support
Vibration Piling Machine
Hydraulic Pile Driver
Drop Hammer
55kw
With Noise
ISO 9001:2000
New
1-2m/Min
380mm
100L/Min
130-800mm
35
2400r/Min
3600mm
5km/H
55kw
7200kg
HW
Wooden Case
CE
Shangdong China
8430100000
Product Description
 
Product Description

Pile Driver

Pile driving speed,the average 3 minutes can realize piling 6 meters deep,namely a hole 3 minutes to play.
 
Oil province,is a common driver uses around half of a year can be a driver left money for you.
 
Bit using manganese steel manufacturing,through processing,are suitable for all kinds of geological environment.
 
Crawler walking,high walking and climbing ability
 
The frame can be moved back and forth,bit can be adjusted,high piling position accuracy.
 
Product Parameters

 

ModelHWL390H
Work quality7.41T
Rated power/Speed85KW/2600RPM
Max torque/Speed375N · M/1850RPM
Work pressure100Mpa
Drill pipe diameter100mm
Shipping size4500*2260*2970
Frame rotation angle360°
Traveling speed3km/h
 

Product Applications

HWL390H Photovoltaic piling machine is a high-performance piling equipment launched by Hengwang Group according to different sites.

In addition to piling the foundation of photovoltaic power stations, it can also be used in farms, pastures, forest farms, orchards and other construction scenarios.
Detailed Photos

 Main feature:

-Install a large number of support piles/pedestals in the shortest possible time.
 

-Initially, 30 piles could be installed per day, and today the production has increased to an average of 50 piles.
 

-Your installation costs are reduced by 40% compared to traditional installation methods. Save measurement costs and reduce personnel.


Buyer review
Loading review details...
Contact

Ji Ning Hengwang Mining Machinery Co., Ltd.

Audited Supplier10 Years
ProfileCertified by SGS/BV

Message Type

* Content

* Name

* Phone

* Email

* Captcha

captcha

Recommended for you