• Overview
  • Details
  • More
Share Products Categories Channel Cart
1/6
Engine Cylinder Head Gasket for Chevrolet Sail1.4 Aveo Hatchback (T300) 1.4 Head Gasket OEM 9024764图1Engine Cylinder Head Gasket for Chevrolet Sail1.4 Aveo Hatchback (T300) 1.4 Head Gasket OEM 9024764图2Engine Cylinder Head Gasket for Chevrolet Sail1.4 Aveo Hatchback (T300) 1.4 Head Gasket OEM 9024764图3Engine Cylinder Head Gasket for Chevrolet Sail1.4 Aveo Hatchback (T300) 1.4 Head Gasket OEM 9024764图4Engine Cylinder Head Gasket for Chevrolet Sail1.4 Aveo Hatchback (T300) 1.4 Head Gasket OEM 9024764图5Engine Cylinder Head Gasket for Chevrolet Sail1.4 Aveo Hatchback (T300) 1.4 Head Gasket OEM 9024764图6

Engine Cylinder Head Gasket for Chevrolet Sail1.4 Aveo Hatchback (T300) 1.4 Head Gasket OEM 9024764

Price $2.00
Min Order 10 Pieces  
Shipping from Hebei, China
Quantity
-+
Product details
Head gasket
Spring Washer
Stainless Steel
A Type
All Inclusive
Standard
DOKING
Packaging or Box
M6, M8, M10, M12, M14
China
4016931000
Product Description
Product Name
Cylinder Head Gasket
OE number
9024764
Car Make
for CHEVROLET
Warranty
1 Year
Sample
Support
Quality
100% Tested Before Shipping
Packing
Neutral Packing or As Your Demand
 
 

Shipping:

FAQ
Q1. What kinds of materials can you provide?
A1: NBR, EPDM, SILICONE FKM,NEOPRENE(CR), NR, IIR, SBR, ACM, AEM,Fluorosilicone(FVMQ), FFKM, Liquid Silicone, etc.

Q2. How to select the raw compound for my application?
A2: With years of experience working with a variety of material, we can help select the material that will best suit your needs
while keeping material costs in mind.

Q3. How long can we get the quote?
A3: If your information is complete, we will provide the quotation within 24 hours.

Q4. Can you provide samples? Is it free or extra?
A4: Yes, we can provide samples for free. Freight cost is on your side.

Q5: What is the normal lead time for product orders?
A5: If the stock generally takes 3-7 days, mold about 15-18 days, no mold about 25-30 days, depending on the product situation.

Q6: How to check the quality of the bulk order?
A6: We have incoming inspection, control the quality of raw materials, process inspection,to ensure the quality of the production
process, shipping 100% of the full inspection; automatic inspection machine full inspection, and according to customer needs
before the mass production of pre-production samples.

Q7. What is your standard packing?
A7: Plastic bag for inner packing .carton box for outer packing also be packed according to customer's requirements.

Q8. What's the payment term?
A8:We accept T/T 30% deposit and 70% balance before shipment.

Welcome talking details by email or whatsapp.
Buyer review
Loading review details...
Contact

DOKING INDUSTRIAL LIMITED

Audited Supplier4 Years
ProfileCertified by SGS/BV

Message Type

* Content

* Name

* Phone

* Email

* Captcha

captcha

Recommended for you