• Overview
  • Details
  • More
Share Products Categories Channel Cart
1/6
Efficient Vibrating Screen Gold Wash Plant for Material Classification with ISO9001图1Efficient Vibrating Screen Gold Wash Plant for Material Classification with ISO9001图2Efficient Vibrating Screen Gold Wash Plant for Material Classification with ISO9001图3Efficient Vibrating Screen Gold Wash Plant for Material Classification with ISO9001图4Efficient Vibrating Screen Gold Wash Plant for Material Classification with ISO9001图5Efficient Vibrating Screen Gold Wash Plant for Material Classification with ISO9001图6

Efficient Vibrating Screen Gold Wash Plant for Material Classification with ISO9001

Price $3880.00
Min Order 1 Set  
Shipping from Shandong, China
Quantity
-+
Product details
DMT-5
Gravity Separator
380V
<1T
Carbon Steel
Fire Resistant
ISO9001:2008, ISO9001:2000
Energy Saving
1 Year
Non-Customized
New
1 Set
7-20 Days
5-Ton-Per-Hour
Vibrating Screen
Downunder4gold
Wood Case
2.6 cubic meters
China
8474100000
Product Description
Product Description

DMT-5 is a 5-ton-per-hour vibrating gold wash plant, is a compact and efficient piece of equipment designed for small-scale gold mining operations, prospecting, or testing gold-bearing areas. Unlike traditional trommel wash plants, this type of plant uses a vibrating screen to classify and wash material, making it highly efficient for processing smaller volumes of gold-bearing material. It is ideal for individual miners, small teams, or those working in remote locations with limited resources.
Key Features of a 5-Ton-Per-Hour Gold Wash Plant
1. Compact and Portable: Lightweight and easy to transport, often mounted on a trailer or skids.
2. Efficient Gold Recovery: Combines a vibrating screen and sluice box for effective gold recovery.
3. Low Water Usage: Designed to operate with minimal water, and some models include water recycling systems.
4. Ease of Operation: Simple to set up and use, requiring minimal technical expertise.
5. Cost-Effective: Affordable compared to larger wash plants, making it ideal for small-scale miners.
6. Durability: Built with robust materials to withstand harsh mining conditions.
7. Vibrating Screen: Provides efficient material classification and washing, ensuring high recovery rates.
Components of a 5-Ton-Per-Hour Gold Wash Plant: 
1. Feeding Hopper: Where raw material (gravel, soil, or sediment) is loaded into the plant.
2. Vibrating Screen: A vibrating deck with mesh screens that classifies material by size and washes it simultaneously.
3. Spray Bars: Water jets above the vibrating screen wash the material, breaking up clay and releasing gold particles.
4. Sluice Box: A gold recovery system with riffles to trap gold particles as water washes the material through.
5. Water Pump: Supplies water to the spray bars for washing.
6. Support Structure: A sturdy frame to support the vibrating screen, sluice box, and other components.
7. Optional Add-Ons: extra sluice box.
How It Works:
1. Material Feeding: Raw material is fed into the hopper.
2. Vibrating Screen Classification: The vibrating screen separates larger rocks and debris while washing the finer material.
3. Washing and Classification: Water from the spray bars breaks down clay and washes the material, allowing gold and finer particles to pass through the screen.
4. Gold Recovery: The washed material flows into the sluice box, where gold particles are trapped by the riffles.
5. Concentrate Collection: Concentrates from the sluice box are collected for further processing or refining.
Applications

Small-scale gold mining                                                                                                    Prospecting and exploration

Sampling and testing gold-bearing areas                                                                     Processing placer deposits inremote locations

Product Parameters
Technical Data Sheet: 5-Ton-Per-Hour Vibrating Gold Wash Plant
General Specifications:
ModelDMT-5
Capacity5 tons per hour (depending on material type and conditions)
Power Requirement3-5 kw (depending on configuration)
Water Requirement15-25 cubic meter hour (m³/h)
Dimensions (L x W x H)2.0*1.2*1.5m
Weight470 kg (depending on configuration)
MaterialHigh-grade steel (wear-resistant and durable)
Vibrating Screen Specifications:
Screen Size0.8 m x 2m (approx.)
Screen Mesh SizeCustomizable (e.g., 10mm, 20mm, or 30mm)
Vibration FrequencyAdjustable for optimal material handling
Spray Bars4-6 bars with high-pressure for efficient washing
Drive SystemElectric motor
Sluice Box Specifications:
Length2 meters
Riffle DesignHungarian riffles or expanded metal riffles
MattingRubber matting or miner's moss or dream mat for gold trapping
Adjust-abilitySluice angle can be adjusted for optimal recovery
Delivery time7-30 days (depends on order,normally have in stock)
Container loading capacity6 units/20GP, 24 units/40HQ

Advantages:

1. Portability: Easy to transport and set up in remote areas.
2. Low Operating Costs: Requires minimal water and power.
3. Efficient Recovery: High gold recovery rates for small-scale operations.
4. User-Friendly: Simple to operate, even for beginners.
5. Environmentally Friendly: Minimal environmental impact compared to larger mining operations.
6. Vibrating Screen Efficiency: Provides better material classification and washing compared to traditional trommels.

Considerations:
- Water Supply: Requires a reliable water source for operation.
- Power Supply: May need a generator or external power source in remote locations.
- Material Handling: Best suited for small-scale operations with limited material volume.
Company Profile
Workshop

Packaging & Shipping
Buyer review
Loading review details...
Contact

Downunder (Shandong) Mining Technology Co., Ltd.

Audited Supplier1 Year
ProfileCertified by SGS/BV

Message Type

* Content

* Name

* Phone

* Email

* Captcha

captcha

Recommended for you