Our MPP power pipe is crafted from high-quality modified polypropylene, offering an innovative solution for construction. This advanced pipe eliminates the need for dredging, digging, or disrupting road surfaces, making it the ideal choice for laying pipelines, cables, and other infrastructure projects in challenging sections, including roads, railways, buildings, and riverbeds.
Trenchless pipe engineering, unlike traditional methods, meets the highest environmental protection standards. Traditional construction methods often lead to dust, traffic congestion, and other inconveniences, but our trenchless technology overcomes these obstacles. It is perfect for scenarios where excavation is not feasible, such as heritage conservation districts, dense urban areas, protected farmlands, highways, and river crossings.
Our MPP power pipe boasts numerous advantages: it offers high strength, excellent high-temperature resistance, easy installation, and convenient construction, all at a low cost. It is a superior choice for a wide range of applications.



MPP Cable Conduit Pipe's Parameter Datas | ||||
Norminal Diameter/IN(mm) | Norminal Wall Thickness (mm) | Norminal Lenght (mm) | ||
Ring Stiffness (3%) Grade (Normal Temperature) | ||||
SN24 | SN32 | SN40 | ||
100 | 8 | 8 | 10 | 6000/9000 |
125 | 8 | 10 | 12 | |
150 | 10 | 12 | 14 | |
175 | 12 | 14 | 16 | |
200 | 14 | 16 | 18 | |
225 | 16 | 18 | 20 | |
250 | 18 | 20 | 20 |








During the installation of the MPP power cable protection tube, selecting the correct connection method is crucial to ensure reliable operation. This section introduces several common MPP power cable protection tube connection methods to help you understand their characteristics and application scenarios.

02. Remove dirt from both pipe ends. Place the pipe into the frame clamp so the extension length at both ends is equal. The parts outside the pipe rack should be supported. Align the pipe height with the frame's centerline, then secure the slip and insert a milling cutter to mill the pipe.
03. Mill the pipe until continuous cutting occurs at both ends, then remove the pressure and let the milling cutter idle for two to three weeks before retracting the movable frame and turning off the milling cutter switch.
05. Once the heating plate reaches the set temperature, quickly place it into the rack and apply the specified pressure until the circumference of the pipe ends is flipped and the minimum curling reaches the specified height. Reduce the pressure to the specified value to ensure the pipe end faces are in contact with the heating plate, and continue heating until the specified time.
06.When the heat absorption time reaches the specified value, retract the movable frame and quickly remove the heating plate. Close the two pipe ends as quickly as possible, ensuring the switching time does not exceed the specified limit. The closing pressure should not be too high to avoid squeezing out molten material and compromising welding quality.
07.Raise the pressure to the specified value and maintain it for cooling. After natural cooling to room temperature, release the pressure, loosen the slip, remove the pipe, and complete the welding process.

Our extensive product range includes HDPE, PVC, PP-R, MPP, and numerous other series, perfectly suited for applications in construction engineering, municipal engineering, agricultural drainage and irrigation, gas transportation, home decor, and power cable sheathing among others. With nearly 3000 distinct varieties and specifications of pipes, fittings, and valve products, we cater to diverse needs with precision.

Our Advantages
Dedicated to international trade, we provide bespoke services to pipeline dealers across the globe. Our investment in cutting-edge mechanical equipment supports the creation of a state-of-the-art factory, boasting an impressive annual output of 30,000 tons - equivalent to filling 3,000 containers.
Leveraging superior machinery and an impeccable management system, we effectively reduce costs, expedite delivery, and ensure the unparalleled quality of every product.
Are you a trading company or a factory?
We are a distinguished manufacturer. We warmly invite you to visit our factory at your convenience.
How long is your delivery time? For small quantities, we ship via international couriers like DHL, FedEx, and TNT, or by air. Typically, you will receive your goods within 3-5 days after dispatch. For larger orders, we ship by sea, with arrival times ranging from days to weeks, depending on the destination port.
Can you provide samples?
Yes, samples are available. For standard products, samples are free but you need to cover the shipping costs. For high-value products, both the shipping and a portion of the product cost apply. Long-term partners and VIP customers enjoy free samples upon request.
Do you supply OEM services?
Yes, we provide OEM services tailored to your requirements, including logo design and packaging.
What are your terms of payment?
We accept TT or L/C at sight. For TT, a 30% advance is required with the balance due before shipment. Alternatively, payment can be made via L/C.
What is your Minimum Order Quantity (MOQ)?
Our MOQ is flexible and can be adjusted according to customer requests.
Can I use my own label or packaging?
Absolutely. We can customize labels and packaging according to your requirements.
How can you ensure the quality of the goods?
We uphold honesty and responsibility as our core values. Rest assured, all our products are qualified. We conduct rigorous testing and provide Certificates of Analysis (COA) before delivery.