• Overview
  • Details
  • More
Share Products Categories Channel Cart

1/6
Construction Machine Precast Concrete Double T Beam Double T Panel / Slab Moulds图1Construction Machine Precast Concrete Double T Beam Double T Panel / Slab Moulds图2Construction Machine Precast Concrete Double T Beam Double T Panel / Slab Moulds图3Construction Machine Precast Concrete Double T Beam Double T Panel / Slab Moulds图4Construction Machine Precast Concrete Double T Beam Double T Panel / Slab Moulds图5Construction Machine Precast Concrete Double T Beam Double T Panel / Slab Moulds图6

Construction Machine Precast Concrete Double T Beam Double T Panel / Slab Moulds

Price $100000.00
Min Order 1 Set  
Shipping from Shandong, China
Quantity
-+
Product details
DT-01
Online Technical Training or to The Site
1 Year
Particle Board Making Machine
Semiautomatic
Electric
Single-Screw
CE, ISO
New
Customized
Producing Double T Slab
Dezhou Haitian
Customized
Hai Yu
Wooden Case
customized
China
Product Description
                                               construction machine precast concrete double T beam double T panel / slab moulds
Product Description

 


 1. Advantages: Large span, 8-9 meters or even more than 30 meters can be achieved.
Advantages: light weight, good fire resistance, strong durability, low cost and short construction period.
2. Process flow:
Mold cleaning, paint release agent, steel strand installation layout, (install end mold, install mold, steel strand tension), install mesh,
Cloth, maintenance, demoulding, release, finished products are transferred to the storage yard for maintenance.
3. Process points:
The mold has less seams so that the force is reasonable.
The arrangement of steel strands must not cross.
The ribs are poured first and then the panels are poured.
Vibrate to avoid the steel strand.
The curing steam temperature should not exceed 70°C.
Put the sheet from the two sections to the middle.
Lift two cranes at the same time.
The stacking is also in accordance with Duanmu's standard.
4. Labor cost:
A 120-meter line
4 people in one hour
Clean and oil for half an hour 4 people
Wiring puzzle 2 hours 4 people
Stretch for an hour for 2 people
Mesh embedded parts for two hours for 2 people
Fabric 2.5 hours for 5 people
No labor is needed for curing for 8-10 hours.
5. Board width, rib height, rib spacing and overall length are adjustable
6. Production line equipment:
Mould, tension, cloth (feeder plus track, or gantry cloth machine, or simple hopper), vibrating, maintenance (film or pipe addition), auxiliary equipment (ladder, sweeper, spreader, etc.)
Detailed Photos

Buyer review
Loading review details...
Contact

Dezhou Haitian Electromechanical Technology Co., Ltd.

Audited Supplier6 Years
ProfileCertified by SGS/BV

Message Type

* Content

* Name

* Phone

* Email

* Captcha

captcha

You May Like
Home > Products > Manufacturing & Processing Machinery > Building Material Making Machinery > Board Making Machine