Customized
Technical Assistance on-Line
1 Year
ISO, CE
Steel
Base Formwork
Blue
Bolt
Spray Painted
Graphic Design
Bundling
Ton
Spot Supply
Bridges Spanning Roads or Water
32# 40#
Zhongtai formwork
Standard Sea-Transport Packing
Customized
Shandong China
7308400000
Product Description
Meaning | cantilever form traveler is a commonly used template system in construction for building hanging baskets. The cantilever form traveler is mainly composed of columns, beams, and brackets, and can be used for the construction and maintenance of the exterior walls of high-rise buildings. The main function of the hanging basket template is to provide a platform and safety guarantee for workers to operate, making the workflow more efficient and safe. |
Material | Q235b |
Type | Diamond shaped hanging basket, triangular hanging basket, truss cantilever form traveler and cable hanging basket |
Advantages | Durable, strong load-bearing capacity, high safety factor, and high reuse rate |
Purpose | Railway bridges, highway bridges, water conservancy bridges, etc |
Divided by span | 48m, 64m, 80m, 100m, 128m |
According to the cross-sectional box division | Single box, double box, multi box |
Single diamond frame bearing capacity (t) | ≤ 80 tons ≤ 120 tons |
Mass ratio of suspended basket to beam concrete | 0.3-0.7 |
Applicable segment length for hanging basket (m) | 2-4.5m |
Hanging basket suitable for single side length of block 0 # (m) | ≥4.5m ≥6m |
Track length (m) | 0.5m, 1m, 1.5m, 2m, 3m 0.5m, 1m, 1.5m, 2m, 3m |
Maximum deformation (excluding sling deformation) | ≤20mm |














Zhongtai South China Heavy Industry (Hangzhou) Co., Ltd. is a comprehensive enterprise integrating steel formwork product design, production, leasing, sales and service, providing one-stop purchase of flat formwork, cantilever hanging basket formwork, cylindrical formwork, cap and other steel formwork.
The company's products are widely used in the construction of bridges, roads, railways, subways, integrated pipe corridors, power stations, airports, water conservancy, tunnels and other engineering projects.




We are an industry-trade company.
2.What do you do?
We design and manufacture formwork and scaffolding products for concretestructure pouring in engineering projects such as bridges, highways, railways.subways, comprehensive pipe galleries, power stations, airports, waterconservancy,tunnels,etc.
3.How long is the delivery(production) and shipping time?
If the goods are in stock, we will arrange shipment within 3-5 days after receivingyour down payment. lf the goods are out of stock, they will be determined based onthe quantity.
4.Why do you buy from us instead of other suppliers?
1. Professional team, 12 years of market experience;
2. Own source factory supply, production capacity of 300,000 tons/year;
3. One-stop service center to meet all steel formwork needs;;
4. 24-hour online service
5.How to confirm payment?
1. T/T: 30% T/T of the advance deposit and 70% T/T of the balance before delivery;
2.Letter of Credit:100% irrevocable letter of credit