The C-at 420F backhoe loader is a powerful and versatile machine that is ideal for a variety of applications. It is powered by a C-at C9.3 ACERT engine that delivers 412 horsepower and 1,550 lb-ft of torque. The backhoe loader is also equipped with a number of advanced technologies that help to improve performance and efficiency. It is a comfortable and safe machine to operate, making it a great choice for any construction or landscaping project.

of tasks.
accident.



Weight | 11 t |
Standard tyres | 11L-16 (12 ply) F-3/19.5L-24 (12 ply) R4 ATU |
Bucket capacity | 0.96 m³ |
Transport length*width*height | 7.169*2.322*3.577m |
Bucket width | 2.262 m |
Travel speed | 40 km/h |
Max. discharge height | 2.746 m |
Engine manuf. | Cater-pillar |
Engine type | 3054C DIT |
Engine power | 70 kw |
Revolutions at max torque | 1400 rpm |
Displacement | 4.4 l |
Cylinder bore x stroke | 105x127 mm |
Max. torque | 438 Nm |
Shandong Tiger International Trade Co., Ltd. belongs to ZW Group, the headquarters office is located in Jinan, Shandong, and the construction machinery factory is located in Shanghai, China.
We are committed to providing our customers with the best possible experience. Our team of experienced professionals is here to help you find the right equipment for your needs and get it to you quickly and efficiently.






1.Do you have your own factory?
We have our own factory with 10 years experiences in trailer production.Also we own modified factory for trucks.Besides trucks and trailers,various international brand earthmoving machines is available.We sincerely welcome you to visit our factory.
2.How long it will take for an order to be delivered?
15 to 20 working days after we received your 30% payment inadvance or 100% L/C at sight. The specific delivery time depends on the items and the quantity of your order.
3.Can I get a sample or order 1 unit?
Yes, our MOQ is 1 set.
4.What is the time for delivery?
If standard model we have in stock can ship it out within 10 days after payment. If used trailer or truck,we can ship it out within 10 days after payment. Because we have to renovate and paint it. If it is a new production, usually cases in 20 days can be finished for shipment.
5.What's your payment terms?
T/T: 30% deposit by T/T,70% balance should be paid before shipment.