• Overview
  • Details
  • More
Share Products Categories Channel Cart
1/5
Brass Material Mixing Valve Pump Speedfit Underfloor Heating Manifold图1Brass Material Mixing Valve Pump Speedfit Underfloor Heating Manifold图2Brass Material Mixing Valve Pump Speedfit Underfloor Heating Manifold图3Brass Material Mixing Valve Pump Speedfit Underfloor Heating Manifold图4

Brass Material Mixing Valve Pump Speedfit Underfloor Heating Manifold

Price $30.00
Min Order 500 Pieces  
Shipping from Zhejiang, China
Quantity
-+
Product details
Water, Ethylene Glycol Mixture
-20° C~120° C
1/2"~2" Female Thread
Pn≤ 1.6MPa
Other
±10%
Cooling/Heating System and HVAC Stystem
ZTN
Pallet and Carton
DN15, DN20, DN25
China
Product Description
Technical standard
  • Working pressure:1.6 MPa
  • Working medium: Water,oil, and other non-corrosive liquid
  • Working temperature: 0° C≤ T≤ 120° C (from 32°F to 248° F)
  • End Connection: G thead
  • Thread standard: ISO228(equivalent to DIN 259 and BS2779)
  • Size: 1/2"-2"
  • Packing: Inner boxes in cartons, loaded in pallets
Component material

NoName Material
1Valve bodyHPb57-3
2GasketPTFE
3Copper rodHPb57-3
4GasketPTFE
5Water pressure plateHPb57-3
6O-RingEPDM
7O-RingEPDM
8Clasp springClasp spring
9Lead screwClasp spring
10Valve stemEPDM
11Lock capHPb57-3
12Hand wheelPA66
13Valve capHPb57-3
14Load measuring joint (Red)Component
15Load measuring joint (Blue)Component
16Rubber gasketEPDM





FAQ:

Q1.Can I get free samples?
A: Yes,we can provide you the free sample, but you need to bear their own delivery costs.
 
Q2. Can I have a sample order for fittings?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.

Q3. Are you a trading company or a manufacturer?
 A: We are a manufacturer.

Q4. What is your payment term?
 A:Normally T/T 50% in advance, balance to be paid before delivery.

 Q5: What is your main market?
 A:North America,Greenland,South America,Africa,Southeast Asia, Former Soviet Republics ,East Asia,and Europe.

 Q6:What kind of trade terms can you do?
A:EX-WORKS,FOB,CFR,CIF,etc.

Q7. What about the lead time?
A:Sample needs 10 days, mass production time needs 45 days.
Buyer review
Loading review details...
Contact

Flowflex Enterprise Co., Ltd.

Audited Supplier2 Years
ProfileCertified by SGS/BV

Message Type

* Content

* Name

* Phone

* Email

* Captcha

captcha

Recommended for you