| Electricity | single phase (elec.) 220VAC, 50/60Hz, 20A, 1.5kw |
| Power | 1.35kw |
| Turntable Diameter | Φ1800mm |
| Product Spec | L1100-1200*W1000-1100*H1000-1500MM (Including cardboard height) |
| Effective winding height | 2100mm;The top of the product is not wrapped |
| Column Height | 2500mm |
| Wrap efficiency | 20-40 pallets/hour |
| Turntable Height | 90mm |
| Turntable Load Capacity | 2000kg |
| Packaging material | LLDPE stretch film, thickness: 17-30μm, width: 500mm, inner roll: 76.2mm, max. outer roll diameter: 260mm. |
| Performance | Winding machine with automatic film loading and breaking, with pre-tensioning device, with ramp plate |
| Turntable speed | 0-15 RPM, slow start and stop, frequency conversion speed control |
| PLC | The machine can be programmed to control the operation of the whole machine, the number of winding layers and times |
| Remote Control | Remote control start or stop |
| Lifting Mechanism | Frequency conversion speed control, adjustable rising and falling speed of membrane frame, double chain drive, safe and stable. |
| Membrane system | Film frame power pre-stretching mechanism, pre-stretching up to 250%, effective saving stretch film, the film feeding speed control system, film tensioning strength can be adjusted. The film system follows the structure of the machine, safe and convenient |
| Configuration | PLC adopts Panasonic; frequency converter adopts Delixi/China; proximity switch adopts Chande; motor and reducer adopts TCG; photoelectric switch adopts OMRON; low-voltage switch adopts Astronergy; columns and mold frame part adopts the surface treatment of spraying antirust paint and then plastic spraying. |
| Product Color | dark or deep green |



Q1.How about product packaging?
A:Before the product is shipped, it will bepacked Plywood box plus bottom tray(wooden tray or steel tray).
Q2. What is your terms of delivery?
A: EXW, FOB, CIF...
Q3.How about your payment term? What kind of payment term you can accept?
A:As usual, the payment term is TT,30% deposit, the balance after machine testing and before delivery.
Q4. How about your delivery time?
A: Generally, it will take 15-20 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5.How to answer technical guidance?
A:We will provide solutions based on theirspecific requirements, combined withtechnical feasibility and production costs.
Q6.How about the product transportation?
A:Products are generally shipped fromShenzhen Port, China to the destination portby sea.



















