• Overview
  • Details
  • More
Share Products Categories Channel Cart

1/6
Aluminum Panel Formwork Mould for House and High Bulidings Construction图1Aluminum Panel Formwork Mould for House and High Bulidings Construction图2Aluminum Panel Formwork Mould for House and High Bulidings Construction图3Aluminum Panel Formwork Mould for House and High Bulidings Construction图4Aluminum Panel Formwork Mould for House and High Bulidings Construction图5Aluminum Panel Formwork Mould for House and High Bulidings Construction图6

Aluminum Panel Formwork Mould for House and High Bulidings Construction

Price $100.00
Min Order 1 Square Meter  
Shipping from Shandong, China
Quantity
-+
Product details
Panel
Available
1 Years
ISO, CE
Steel
Wall Formwork
MACPEX
Standard
China
8480411000
Product Description
ItemsAluminium formwork
1. MaterialAluminium alloy 6061-T6
2.InstallationAfter short period of training, workers can easily learn to install and dismantle the formwork.
3.Construction period3-5 days per storey.
4.Machine assistanceDoes not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used.
5.Quality of formworkThe aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won't be wasted.
6.Plastering costAs the smooth effect after removing the formwork, there is no need to plaster.
7.Formwork stabilityThe load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting.
8.Scrap valueThe scrap value is about 50% of the new panel.

workshop:


Shipment:

Certificate:
Buyer review
Loading review details...
Contact

SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.

Audited Supplier7 Years
ProfileCertified by SGS/BV

Message Type

* Content

* Name

* Phone

* Email

* Captcha

captcha

Recommended for you