• Overview
  • Details
  • More
Share Products Categories Channel Cart

1/5
AC DC Combo Charging Station with CCS2 Chademo Type Charge Connector 103kw in One EV Charging Pile图1AC DC Combo Charging Station with CCS2 Chademo Type Charge Connector 103kw in One EV Charging Pile图2AC DC Combo Charging Station with CCS2 Chademo Type Charge Connector 103kw in One EV Charging Pile图3AC DC Combo Charging Station with CCS2 Chademo Type Charge Connector 103kw in One EV Charging Pile图4

AC DC Combo Charging Station with CCS2 Chademo Type Charge Connector 103kw in One EV Charging Pile

Price $26899.00
Min Order 1 Piece  
Shipping from Zhejiang, China
Quantity
-+
Product details
ANADCE1-43kW/60kW
One Pile with Multiple Charges
Public Use
Floor Type
Quick Charge
3pH+N+PE(L1, L2, L3, N, PE)
CCS2*1+Chademo*1+Type2*1
43kw(AC); 60kw(DC)
Aoneng
Wooden Case Packing
750 (W)*750 (D) *1800 (H) mm
China
850440
Product Description
Product Description

Product Parameters
Input
Model No
ANADCE1-43kW/60kW
Voltage
400 VAC ± 10% / 3 Phase + N + PE
Frequency
50/60 Hz
Power Factor
≥ 0.98
THDi
≤ 5%
Output
Connector
AC Type 2                   CCS 2                   CHAdeMO
Charging power
43kW                           60kW                    60kW
Voltage
400 VAC ± 10%           200~ 750 VDC      200~500 VDC
Current
63A,3 Phase                0~ 125 A               0~125A
Efficiency
≥ 95.5%
Connection Case
Connection Case
Cable length
5 meter
HM
Interface
Display
7'' Color Touch Screen
Payment Method
Credit Card, RFID card, Phone APP with backend
Others
Noise
≤ 65 dB
Cooling method
Forced air cool
Protection Level
IP 55
Dimension
63A, 3 Phase
Dimension
700(W)*450(D)*1900(H)mm

 

Certifications


 

Case Show

FAQ

Q:   Are you the factory or trading company?
A:      We are factory with more than 20 years in the field of DC power supply solution,  traction power supply and new energies. We warmly welcome you for the visit.

Q:   How is the delivery time?
A:      Generally, the delivery time between 7-30 days after getting client's payment. For accurate info depends on the products and the quantity, we can make further communication on this.

Q:  Do you have MOQ requirements?
A:     MOQ 1 PC,besides,we have more than 100 technicans to fully meet with customized requirements.

Q:  How long to fully charge a car?
A:      To know how long to charge a car, you need to know the OBC(on board charger) power of the car, the car battery capacity, the charger power. The hours to fully charge a car =battery kw.h/obc or charger power the lower one. For e.g, the battery is 40kw.h, obc is 7kw, charger is 22kw, the 40/7=5.7hours. If the obc is 22kw, then 40/22=1.8hours.

Q:   Can you provide customized service?
A:      Yes. we have been getting involved with the OEM and ODM projects since 2004. So that we can provide professional customized service for our clients.

Q:   Do you have after sales service?
A:      Yes, we have the after-sales service team. Our after-sales engineer Can give the support and instruction by video or phone call while needed.

Q:   Do you make the test after finishing production?
A:      Yes, our production engineer team will do the test while goods finished, and we will prvoide the test info to clients for reference before delivery.

Buyer review
Loading review details...
Contact

Hangzhou Aoneng Power Supply Equipment Co., Ltd.

Audited Supplier2 Years
ProfileCertified by SGS/BV

Message Type

* Content

* Name

* Phone

* Email

* Captcha

captcha

Recommended for you