| Product Specification | Remark | |||
| Description | Solar Road Stud (round shape) | 2 size | ||
| Model Number | JY-DDSY-D115-X | |||
| Product Dimension | D115*H23 mm | |||
| Power | Material | Mono-crystalline silicon solar cell,100mA | ||
| Voltage | 2V | |||
| Output max consumption | 0.2W | |||
| Battery | Hi-Temp NI-MH battery,1.2V,600 mAh | |||
| LED | Quantity | 2 pcs per side (Total 8 LED) | ||
| Color | Red/white/yellow/green/blue | |||
| Frequency | 2Hz±20% flash or steady light | |||
| Visible Distance | >800 m | |||
| Working Time | 100h after fully charged (flash) | |||
| Light Intensity | 6000~10000 mcd | |||
| Starting Light Intensity | <500 Lux | |||
| Main Material | Anti-UV PC | |||
| Lifespan | 3 Year | |||
| Working Temperature | -20-60 ºC | |||
| Resist Compression | Up to 15 ton (statics) | |||
| Ingress Protection | IP67 | |||
| Net Weight | 285 g | |||
| Packing | 60 pcs/carton / 39 x 29 x 27 cm | |||
Production & Testing 



- Professional R & D team,
- High efficiency management system,
- More than 9 years solid manufacturing experiences,
- Experienced process standard to different countries (North America, Europe, Australia, Africa,etc.)
MovEver Industrial located in Shenzhen, China, which is specializing in roadway safety products & luminous lighting product design service and manufacturing.
We keep learning forever, moving forever, Let's serve for you to be a comprehensive traffic safety, LED lighting solution provider.
we have below products range:
A. EXW, FOB, CFR, CIF is optional for your choice.
B. Telegraphic Transfer (T/T), Letter of Credit, WU, PayPal are accepted.
Production control

Quality control

Question A: How do you control product quality?
>Answer: We have IQC did random inspection and test when raw material was coming,
IPQC did inspection and test of electronic performance for each production line,
FQC did 100% full inspection for appearance & function before packing,
OQC did random inspection as per latest AQL standard.
Question B: What is your minimum order quantity and production lead time?
>Answer: For all modes, we provide sample or sample order, take 3~5 days,
for mass order, average lead time is 7~10 working days.
for glass road block mass order, average lead time is 25~30 working days.
Question C: How to control the delivery products are we need?
>Answer: We will take picture for appearance & package and video for functions test for your approval before delivery.
Question D: What is your after-sale services?
>Answer: We will replace it free in guarantee period.


















