• Overview
  • Details
  • More
Share Products Categories Channel Cart
1/6
63A 4p ATS Changeover Switch Automatic Transfer Switch for Generators图163A 4p ATS Changeover Switch Automatic Transfer Switch for Generators图263A 4p ATS Changeover Switch Automatic Transfer Switch for Generators图363A 4p ATS Changeover Switch Automatic Transfer Switch for Generators图463A 4p ATS Changeover Switch Automatic Transfer Switch for Generators图563A 4p ATS Changeover Switch Automatic Transfer Switch for Generators图6

63A 4p ATS Changeover Switch Automatic Transfer Switch for Generators

Price $21.50
Min Order 20 Pieces  
Shipping from Zhejiang, China
Quantity
-+
Product details
WLS1-63GA
1 Year
Manual and Auto
CE
PC
4P
Dual
100A - 3200A
220V/380V
50/60Hz
PC Class
WZAZURE /OEM
Export Packaging
1PCS/CTN
Zhejiang, China
853650000
Product Description
ATS controller automatic transfer switch  changeover switch
 
         automatic transfer switches are mainly used for AC 50HZ / 60HZ, rated voltage 400V, control rated voltage 220V, rated current 16A to 3200A in the distribution or motor network, main power or standby power or mutual equipment switching system and mains and power Unit load switching. At the same time, it can operated under un-frequency on and off circuit act as a disconnector.

   The products are widely used in  important power supply sites, which transport , power distribution systems and automation systems . For fire protection, Hos-pital, bank, building etc  that do not allow power off.


Technical parameters

FUNTION CHARACTER

  Main power and standby power or mutual standby power change over system or city power and generator group overload switch-over. At the same time, it can operated under un-frequency on and off circuit act as disconnector.

    Safety protection, cut off quickly ,When the voltage outgoing line fluctuates. the power canbe cut of quicky (less than 2 seconds) and theovervoltage will not be bumed .


Product Display 

FAQ :

Q1: Can I print my logo on the products?
A: Yes, OEM available. ( MOQ : 100 Pieces )

 

Q2: Do you have inspection procedures for products?
A: Our products100% self-inspection and testing before packing.

 

Q3: How about delivery time of the order?
A: 5-10 days after getting deposit. ( We have stock for conventional parameters ) 



Any requirements or question,welcome to "Send" us an e-mail Now!!!

Buyer review
Loading review details...
Contact

Wenzhou Weilan Electric Co., Ltd.

Audited Supplier6 Years
ProfileCertified by SGS/BV

Message Type

* Content

* Name

* Phone

* Email

* Captcha

captcha

Recommended for you