Product Description
30t EAF Short Process Steelmaking Plant Equipment turnkey steel making project for melting scrap iron and sponge iron



Investment Estimate of 2500tons SM per year Production Line.
Sales team:
SN | Equipment | Spec. |
A-Steelmaking process equipment | ||
I | Scrap bay | |
40t/10t bridge crane | Lk=22.5m, A6 with magnetic disc | |
16t/3.2t bridge crane | Lk=22.5m, A6 with crab | |
100t rail weigher | ||
80t electrical flat car | Rail distance: 2000mm , Stroke: 30m | |
Scrap bucket | Bottom open V=65m3 | |
Scrap bucket hanger | For scrap bucket | |
3t maintenance hoist | CD1, H=18m | |
II | Melting bay | |
1 | Crane | |
150t/50t double girder metallurgical crane | Lk=26.5m,A7 | |
80t/20t/5t bridge crane | Lk=26.5m,A7 | |
3t maintenance hoist | CD1, H=30m | |
2 | 70t EBT UHP Electric arc furnace | |
Furnace shell | ||
Furnace roof | ||
Seat, platform, tilting mechanism | ||
Maintenance platform | ||
Electrode nippling device | ||
Roof lifting & rotating mechanism | ||
Column | ||
Electrode arm | ||
Water cooled cables | ||
Short net | ||
Furnace transformer | HSSPZ-56000KVA/33KV | |
Series reactor | 9000KVar/33kV | |
H.V. switchboard | GBC-40.5KV | |
L.V. power distribution & cotrol panel | ||
PLC panel | Siemens PLC S7-300 | |
HMI & software | WinCC + Step 7 | |
Hydraulic power pack | ||
3 | 80t Ladle Furnace | |
Roof | ||
Roof lifting & rotating mechanism | ||
Electrode nippling device | ||
Column | ||
Electrode arm | ||
Water cooled cable | ||
Short net | ||
Furnace transformer | HSSPZ-12000KVA/33KV | |
H.V. switchboard | GBC-40.5KV | |
L.V. power distribution & cotrol panel | ||
PLC Panel | Siemens PLC S7-300 | |
HMI & software | WinCC + Step 7 | |
Hydraulic power pack | ||
Ladle car & drawing cable | ||
4 | Furnace auxiliary equipment | |
EAF door lance manipulator | Oxygen: 4000Nm3/h | |
EAF wall lance | Oxygen: 1000Nm3/h, CNG: 300Nm3/h | |
Horizontal ladle preheater | JHK-80-2 | |
Vertical ladle preheater | JHK-80-1 | |
Scrap bucket hanger | ||
80t electrical flat car | Rail gauge: 1435mm , Stroke: 20m | |
Ladle | 80t | |
Ladle hanger | ||
Wire feeder | WX-4BF, double wires | |
Shell sling | ||
EAF refractory gunning machine | ||
5 | EAF materials charging system | |
DRI bin & weighing system | ||
Bulk material bin & weighing system | ||
Auxiliary material hopper & weighting system | 5m3 | |
Conveyor & transportation system | ||
EAF charging hopper & chute | ||
LF charing hopper & chute | ||
Power distribution panel | ||
PLC | Siemens PLC S7-300 | |
III | Casting bay | |
1 | R6m 5 strands billet CCM | 120 sq.mm & 150 sq.mm billets |
Ladle turret | ||
Tundish car | ||
Tundish | ||
Mold | 120 sq.mm & 150 sq.mm | |
Overflow chute & slag pot | ||
Secondary cooling part | ||
Withdrawal straightening machine | ||
Guide roller | ||
Dummy bar | ||
Dummy bar storage device | ||
Flame cutting machine | ||
Cut to length device | ||
Roller after cutting | ||
Billet pusher | ||
Billet storage unit | ||
Power distribution panel | ||
VVVF panel | ||
PLC panel | ||
HMI unit & software | ||
Instrument | ||
2 | Others | |
Off line & maintenance equipment | Tundish rack, mold repairation rack | |
5t Column cantilever crane | R=5m, H=10m | |
50t/10t bridge crane | Lk=28.5m, A6 | |
3t maintenance hoist | CD1, H=18m | |
50t electrical flat car | Rail gauge: 1435mm , stroke: 20m | |
Tundish | ||
Ladle hanger | 70t ladle | |
IV | Billet bay | |
20t/5t bridge crane | Lk=28.5m, A6, one set with grab | |
Billet sling | ||
B-Factory power distribution system | ||
I | Power distribution system | |
H.V. panel | 40.5KV | |
H.V. panel | 12KV | |
Microcomputer protection device | ||
DC panel | DC220V | |
Power transformer | S11 2000kVA, for water treatment plant | |
Power transformer | S11 1600kVA, for main melt shop | |
Power transformer | S11 1000kVA, for oxygen plant, compressor | |
Power transformer | S11 800kVA, for lighting | |
L.V. power distribution panel | ||
Junction box | XLL2 type or XL-21 type | |
C-Air separaton part | ||
I | KDOAr-3200/80Ar air separation plant | Oxygen purity: 99.6% |
Air filter | ||
Precooling unit | ||
Air compressor | ||
Piping after compressor | ||
Cold box | ||
Heater | ||
Expension machine | ||
Oxygen compressor | Pressure: 3.0MPa | |
Nitrogen compressor | ||
Cryogenic liquid pump | Pressure: 3.0/15.0Mpa. | |
Oxyge, nitrogen bottle filing device | 100Nm3/h, pressure: 15MPa | |
Oxygen control valve group | P=3.0MPa/1.6MPa | |
Nitrogen control valve group | P=3.0MPa/1.6MPa | |
Oxygen storage tank | 200m3 | |
Nitrogen storage tank | 100m3 | |
Argon storage tank | 20m3 | |
H.V. switchboard | ||
Starter panel | ||
L.V. power distribution panel | ||
PLC panel | ||
HMI station & software | ||
Instrument | ||
II | Bridge crane | Q=20t/5t, Lk=15m, H=9m |
III | Compressor | |
Water cooled screw compressor | LGD-185/347E type, Q=20m3/min, P=0.8MPa | |
Air holder | C-6/0.8 type, V=4m3;P=0.8Mpa | |
NS energy storage type cold dryer | Q=20m3/min, with purifier | |
D-Fume extraction part | ||
I | Dedusting system | |
EAF canopy & accessory | ||
Canopy pipe | ||
EAF Main fume pipe | 100m | |
LF fume pipe | 30m | |
EAF water cooled fume pipe | 55m Φ1800 | |
LF water cooled fume pipe | 25m Φ700 | |
Fume reversal cylinder | ||
Mixer valve | ||
Regulating valve | ||
Dust collector | 15000m2 | |
Filter bag and bag case | Φ160*6500 , around 4650pcs. per set | |
Dust discharge valve | ||
Dust conveyor | ||
Blower | 60Nm3/h | |
Fluid couplier | ||
Main motor | 1250kW 10KV | |
Chimney | ||
H.V. switchboard | ||
Starter panel | ||
L.V. power distribution panel | ||
PLC panel | Siemens PLC S7-300 | |
HMI station & software | WinCC + Step 7 | |
Instrument | ||
E-Water treatment plant | ||
I | Water treatment system | |
Mold cooling water pump | Q=300m3/h, H=125m, N=160kW | |
EAF & LF, fume duct water pump | Q=700m3/h, H=60m, N=160kW | |
Emergency water pump | Q=600m3/h, H=50m, N=110kW | |
Cooling tower pump | Q=600m3/h, H=25m, N=55kW | |
CCM secondary cooling water pump | Q=180m3/h, H=125m, N=90kW | |
CCM cooling water pump | Q=120m3/h, H=60m, N=30kW | |
Mud circulation clean pump | Q=400m3/h, H=30m, N=55kW | |
CCM secondary sedimentation tank pump | Q=400m3/h, H=40m, N=75kW | |
CCM primary sedimentation tank pump | Q=300m3/h, H=25m, N=55kW | |
Oxygen plant cooling water pump | Q=350m3/h, H=65m, N=75kW | |
Submersible sewage pump | Q=15m3/h, H=12m, N=1.1kW | |
Counterflow type FRP cooling tower | Q=1000m3/h,T1<50ºCT2<35ºC,N=30kW | |
Counterflow type FRP cooling tower | Q=465m3/h,T1<50ºCT2<35ºC,N=22kW | |
Sewage counterflow type FRP cooling tower | Q=300m3/h,T1<50ºCT2<35ºC,N=18.5kW | |
High speed filter | Q=210m3/hV=40m/s, Φ2600mm | |
Automatic pipe filter | Q=1450m3/h, N=1.1kW, PN=1.6MPa | |
Automatic pipe filter | Q=1000m3/h, N=1.1kW, PN=1.6MPa | |
Automatic pipe filter | Q=500m3/h, N=0.75kW, PN=1.6MPa | |
Automatic pipe filter | Q=300m3/h, N=0.37kW, PN=1.6MPa | |
Sediment scraper | Lk=8.3m, H=4.0m, N=~8.0kW | |
Electrostatics water treating device | Q=1100-1399m3/h, DN450, PN=1.6MPa, N<30W | |
Air holder | V=2.0m3, ¢1000mm | |
Water quality dosing device | N=0.75+0.37kW | |
Automatic water softening device | Q=15-20m3/h, water hardness<0.1°dH | |
Slow close/open multi function valve | DN150-400 | |
Float ball valve | PN=1.0MPa | |
Single girder bridge crane | Q=3t, Lk=5m, lift stroke: 6m | |
Single rope grab | V=0.5m3 | |
L.V. power distribution panel | ||
PLC panel | Siemens PLC S7-300 | |
HMI station & software | Advantech industrial computer | |
Instrument | ||
Junction box | ||
F-33KV Compensation system(SVC) | ||
SF6 breaker panel | ||
Disconnector | ||
Lightning arrester group | ||
Filter resistance & capacitor bank | ||
Filter reactor | ||
Current transformer | ||
Compensation capacitor | Total capacity: 75MVar | |
TCR & control unit | ||
Wall bushing | ||
Busbar | ||
L.V. panel | ||
PLC & HMI | Siemens PLC S7-300 | |
Pure water device | ||
Accessory | ||
G-Quick laboratory equipment | ||
Rapid sample cutter | ||
Bench driller | Max. drilling hole: Ф15mm | |
Automatic milling machine | ||
Grinder with dust collector | Wheel dia: Ф200mm | |
Infared CS analyzer | Measuring: c:0.002~3.0% s:0.002~0.35% | |
Vacuum direct read spectrolab | Wave length: 130~850mm, 15 channels |



Investment Estimate of 2500tons SM per year Production Line.
Sales team: