High-performance water hammer pump to mountain creek or diversion of the effective gap as the power source, with no electricity, oil, coal and other conventional energy sources, will not cause environmental pollution, day and night uninterrupted automatic lifting, head high , Easy maintenance, long life and other characteristics.
Technical Parameter
No. | Model | KY-Z630T |
1 | Drive Pipe size | 3 inch(φ89) |
2 | Lifting pipe size | 1.5 inch(φ48) |
3 | Minimum Working Fall | 0.5 meters |
4 | Maximum Working Fall | 12 meters |
5 | Optimal Working Fall | 1.5-6 meters |
6 | Quantity of water supplied from the source (Q) | 15-20 m3/h |
7 | Maximum Lift | 100 meters |
8 | Drive pipe length(The best) | 6~8 times as much as working fall |
9 | Angle between drive pipe and ground(The best) | About 7~10 degrees |
10 | Dimension(L×W×H) | 0.63×0.29×1.47 meters |
11 | Net Weight | 104KG |
Working principle



NINGBO ONEREEL MACHINE CO., LTD.Business Type :Manufacturer.
Product Range :Pumps and other Mechanical and electrical rquipment.Products Service:Water pumps, Gas pumps, Vertical multistage cemtrifugal pumps,chemical pumps
Year Established :2011.
Certificate :GS , CE , GB , ISO14001 , CCC.
Company Address :No.1229 Baoshan Road, Daqi, Beilun, Ningbo 315800 China, Ningbo, Zhejiang, China.
ONEREEL is specialized in the design and manufacture Steel Spools, Plastic Spools, Cable roller, Yarn Bobbin, aluminum spool , Cable Reel Stand, Sheave Pulley, Cable Conveyor, Hydraulic Puller Tensioner, Gin Poles, Cable Pulling Winch, Safety Tools, Wire Grip, Plastic Parts, and Pump in the industry since 1991. All of our customer spool and wire carrier are engineered and manufactured in our 120,000 square foot state-of-the-art manufacturing plant located in Ningbo, Zhejiang.
ONEREEL is specialized in the manufacture of reels for cables and electric wires, iron axles, disc spool for steel cables and various delivery reels. With strong technological capabilities and full series of production equipment. All of our products go through the dynamic and static balance tests. We have passed the quality system certification ISO9001:2000 to ensure the product quality. Following the standards of GB4004-83, JB/T8997, DIN46395 and DIN46397 in productions.


Packaging & Transportation

Authoritative Certificate

A: According to spool model and material, we will advise.
Q2: How long is the sample LEAD TIME?
A: For existing samples, it takes 2-3 days. If no stock, we will advise lead time.
Q3: Can you develop new products?
A: Yes, we have new products developing ability and we are good at developing new mold.
Q4: How much is the freight charge?
A: It depends on spool package volume, if small quantity, volume and urgent goods,
we may advise FEDEX or other couriers' charge for your check.
If volume bigger and by seaway suitable, we provide FOB or CIF price to you.
Q5: What format of the file do you need if I want my own design?
A: We have our own mound workshop and can provide spool or other plastic product developing and injection service.
Q6: How about your service?
A: We have pre-sale service, in-sale service and after-sale service. As "Customer First" is the most important principle of company operation.