• Overview
  • Details
  • More
Share Products Categories Channel Cart

1/6
2024 Cheap Customized Galvanized M7 Lighter Pipe Supporting Construction Site Aluminum Fixing M8 Pipe Hanger Tube图12024 Cheap Customized Galvanized M7 Lighter Pipe Supporting Construction Site Aluminum Fixing M8 Pipe Hanger Tube图22024 Cheap Customized Galvanized M7 Lighter Pipe Supporting Construction Site Aluminum Fixing M8 Pipe Hanger Tube图32024 Cheap Customized Galvanized M7 Lighter Pipe Supporting Construction Site Aluminum Fixing M8 Pipe Hanger Tube图42024 Cheap Customized Galvanized M7 Lighter Pipe Supporting Construction Site Aluminum Fixing M8 Pipe Hanger Tube图52024 Cheap Customized Galvanized M7 Lighter Pipe Supporting Construction Site Aluminum Fixing M8 Pipe Hanger Tube图6

2024 Cheap Customized Galvanized M7 Lighter Pipe Supporting Construction Site Aluminum Fixing M8 Pipe Hanger Tube

Price $0.27
Min Order 2000 Pieces  
Shipping from Zhejiang, China
Quantity
-+
Product details
M8
24hours Online
24hours Online
Press Connection
Vertical
Flexible
Carbon Steel
Standard
Yes
COBON
Carton/Pallet
2" 60mm(60-64)
Ningbo
7326909000
Product Description
Product Description

1. Grade: high quanlity
2. Size: 63-315mm
3. Standard: According International standard
Product Name
Metal perforated pipe clamp / Galvanized steel pipe clips / light pipe clamps/with M7 nut and M8 nut
Material
Iron sheet, carbon steel,Galvanized steel
Color
blue white
Surface
zinc plating,galvanization,paint spraying
Grade
best quanlity
Shape
round
Craft
stamping
Used
building industry
Products Show

Product Size
 
REFERENCEØSIZEmmTWO SIDE SCREWWIDTH*THICKNESS(MM)
22206363M6*20(27/28)*(0.7~1.2)
22207575M6*20(27/28)*(0.7~1.2)
22208080M6*20(27/28)*(0.7~1.2)
22209090M6*20(27/28)*(0.7~1.2)
222100100M6*20(27/28)*(0.7~1.2)
222110110M6*20(27/28)*(0.7~1.2)
222120120M6*20(27/28)*(0.7~1.2)
222125125M6*20(27/28)*(0.7~1.2)
222130130M6*25(27/28)*(0.7~1.2)
222135135M6*25(27/28)*(0.7~1.2)
222140140M6*25(27/28)*(0.7~1.2)
222150150M6*25(27/28)*(0.7~1.2)
222160160M6*25(27/28)*(0.7~1.2)
222180180M6*25(27/28)*(0.7~1.2)
222200200M6*25(27/28)*(0.7~1.2)
222220220M6*25(27/28)*(0.7~1.2)
222250250M6*25(27/28)*(0.7~1.2)
222315315M6*25(27/28)*(0.7~1.2)

Our Package

Delivery



Our Company

FAQ

Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 10-20 days if the goods are in stock. or it is 30-50 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000usd, 100="">=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.

Buyer review
Loading review details...
Contact

Cixi Cobon Pipe Clamp Co., Ltd.

Audited Supplier5 Years
ProfileCertified by SGS/BV

Message Type

* Content

* Name

* Phone

* Email

* Captcha

captcha

Recommended for you