• Overview
  • Details
  • More
Share Products Categories Channel Cart

1/6
20~500m3/H Skid Mounted Biogas Desulfurization/Dehumidification Scrubber Tank System图120~500m3/H Skid Mounted Biogas Desulfurization/Dehumidification Scrubber Tank System图220~500m3/H Skid Mounted Biogas Desulfurization/Dehumidification Scrubber Tank System图320~500m3/H Skid Mounted Biogas Desulfurization/Dehumidification Scrubber Tank System图420~500m3/H Skid Mounted Biogas Desulfurization/Dehumidification Scrubber Tank System图520~500m3/H Skid Mounted Biogas Desulfurization/Dehumidification Scrubber Tank System图6

20~500m3/H Skid Mounted Biogas Desulfurization/Dehumidification Scrubber Tank System

Price $0.00
Min Order 1 Piece  
Shipping from Hunan, China
Quantity
-+
Product details
ALBS300
20~300 Nm3/H
VFD with LCD Display/Touch Screen
Moisture&Dust&H2s Removal, Pressure Regulation
for Biogas Generator, Torch or Boiler
One Year
Constant Pressure Feed to Generator
Stainless Steel 304 or Carbon Steel
Anti-Explosion, Variable Frequency Motor
PVC or Stainless Steel Pipes
Pressure Guage, H2s Sensor, Ss Flange,etc
ALONG BIOGAS
LCL or FCL
Complete System
China
8486909000
Product Description

Material option: Cast iron, Stainless steel 304


Our GasCle system is for the pre-treatment of raw biogas from anaerobic reactor, suitable for biogas flow 20 ~ 500 Nm³/hr. The raw biogas from digester always contains saturated water vapor, physical impurities and hydrogen sulfide. These substances should be removed before the utilization of biogas, to avoid damage to generator, burner of boiler and torch or other equipment.

The GasCle system is skid mounted in combination of multiple functional units, or individually installed at project site.

GasCle system has the following modules:
1.  Primary filter (optional)
For preliminary removal of physical impurities and saturated water vapor;
2.  Desulphurization tank.
For reducing the hydrogen sulfide content in biogas, to meet the requirements of follow-up equipment;
3.  Secondary filter.
For Precise removal of physical impurities in the biogas and moisture;
4.  Biogas blower
Increasing biogas pressure for transportation and meed the requirement of follow-up equipment for gas intake pressure;
5.  Electrical control system
Equipped with VFD(variable frequency drive) and LCD touch screen.
- Pressure gauge and H2S analyzer(Optional).
-  Pipes, valves and base frame.


GasCle system has the following functions:
1.  Desulfurization
Hydrogen sulfide can be reduced to 50ppm or less;
2.  Dehydration
Removal of saturated water vapor;
3.  Impurity removal.
Removal of physical impurities and volatile matter of desulphurizer agent;
4.  Pressure increasing
Increment could reach 39.8 kPa or even higher;
5. Pressure stabilization
Stabilizing gas outlet pressure at a fixed value to meet the gas intake pressure requirement of the follow-up equipment;
6.  Measurement of Pressure and hydrogen sulfide content (optional);
7.  Digital display.
Pressure setpoint, gas outlet pressure, motor frequency, motor speed, motor current, output torque, bus voltage, output voltage, power consumption and system operation time would be indicated on the LCD display.













 
Buyer review
Loading review details...
Contact

Hunan Along New Energy Technologies Co., Ltd.

Audited Supplier11 Years
ProfileCertified by SGS/BV

Message Type

* Content

* Name

* Phone

* Email

* Captcha

captcha

Recommended for you