QD-EAR
7/24 Hours Online
18 Months
Solid Wood
3 People
Linear Type
Wall Temperature Control System
Computer Control Panel, With Transom Windows
110V/ 220V
2700W
Hemlock
Far Infrared Sauna
Carbon Crystal Heating Plate
Joda
Touch Screen, Advanced
Made in Canada, Ultra-Durable
CE, EMC, Kc, FCC, LVD, ETL, CB
Yes
Customizable
OEM & ODM
Customized Carton
1200x1050x1900(mm)
China
8516799000
Product Description


The sauna industry is experiencing significant growth worldwide, driven by increasing consumer interest in health, wellness, and relaxation. Saunas are no longer just a luxury but are becoming a staple in homes, gyms, and wellness centers. As more people seek holistic ways to enhance their well-being, the demand for high-quality saunas continues to rise.
With years of expertise, we ensure reliable, timely production for orders big or small without sacrificing quality. We offer custom sizes, materials, and features to give your customers a unique sauna experience. Our strict quality control means fewer returns and happier clients. Plus, our competitive pricing boosts your profit margins while maintaining top standards.

Product Name | Far Infrared Sauna room |
Capacity | 2 person size |
Size | 1200x1200x1900mm |
Power | 1740W |
Temperature | 30°C - 65°C / 86°F - 149°F |
Time Range | 0-60 min |
Rating Voltage | 110/220V |
Control Panel | Including FM/ CD,USB |
Wood Material | Hemlock |
In the sauna | 6mm Tempered Glass, Oxygen Bar, Reading Lamp, Medical Grade Chromotherapy Lighting, Loud Speaker, Handle. |






A: We are a factory.We have 2 wooden sauna room factories in Hefei and Xuzhou. 1 portable sauna factory in Hefei.
Q: How does your factory do regarding quality control?
A: Our products have passes GS,CE,ETL,SASO,SAA,and other domestic and international safety certificates.
Q: What is the payment term?
A: 1) T/T 30% deposit down payment, 70% before the shipping.
2) L/C, D/P, Western Union, PayPal according to different condition.
Q: How long for production lead time?
A: After receive the deposit:
- Sample order:within 10-15 days;
- 20FT container: 20-25 days;
- 40HQ container: 30-35 days.