• Overview
  • Details
  • More
Share Products Categories Channel Cart
1/6
1K One Component Polyurethane Waterproof Coating Used for Construction图11K One Component Polyurethane Waterproof Coating Used for Construction图21K One Component Polyurethane Waterproof Coating Used for Construction图31K One Component Polyurethane Waterproof Coating Used for Construction图41K One Component Polyurethane Waterproof Coating Used for Construction图51K One Component Polyurethane Waterproof Coating Used for Construction图6

1K One Component Polyurethane Waterproof Coating Used for Construction

Price $1.99
Min Order 200 kg  
Shipping from Shanghai, China
Quantity
-+
Product details
SY-C102P
Polyurethane
Roller
Waterproof
60min
5.5-8h
90-95%
6 Month
SUOYI
25kg/Drum., 200kg/Drum
OEM
China
320890
Product Description

General description:
Single-component polyurethane waterproof coating is an environmentally friendly reactive polymer waterproof coating, which is uniformly coated on the construction base with tools such as scraper and roller, and can react with moisture and solidified to become a waterproof coating with elastic, strong and durable.

Typical properties:
                                                                                                              SY-C102P
TypePU
standardGB/T 19250-2013
Area of construction applicationPermanent waterproofing of roof, wall, basement, pool and toilet
ApprearanceBlack uniform solution
Viscosity(23ºC)6000-8000mPa·S
construction time60 min
Touch free time(23ºC)5.5-8h
Solid content90-95%
properties of productstensile strength 2.5-3MPa
elongation at break 550-1000%
tear strength17N/mm²
Strength retention rate after acid treatment >80%
Strength retention rate after alkali treatment>80%
Strength retention rate after heat treatment>100%
Elongation after acid treatment550%
Elongation after alkali treatment550%
Elongation after heat treatment550%
Construction condition requirement1, avoid construction below 5ºC;
2, the construction base without clear water;
3. It is necessary to clean the base in advance to remove the floating slurry and dust;
4, the concrete construction is completed for more than 2-3 weeks before the construction of waterproof layer.

Storage and shelf life
Storage temperature: 5-40ºC,store in a dry and cool room, pay attention to fire prevention, shelf life of 6 months under the closed condition of the original packaging.

Application:
1,buildings, roofs, toilets, cisterns, swimming pools, sewage ponds and other waterproof works;
2,the floor field, instead of the traditional epoxy floor;
3,children's playgrounds, truck carriages, vehicle chassis armor and other occasions requiring impact protection;
4,coastal defense engineering, Bridges, chemical plants, sewage ponds, oil tanks, pipelines and other occasions that need to prevent corrosion.

Company and factory introduction

R&D Centre:

Quality control and foam performance test






Buyer review
Loading review details...
Contact

Shanghai Suoyi Industrial Co., Ltd

Audited Supplier1 Year
ProfileCertified by SGS/BV

Message Type

* Content

* Name

* Phone

* Email

* Captcha

captcha

Recommended for you